Foundation Alliance

 

THE FOUNDATION SPECIALIST THAT YOU CAN DEPEND ON

198 Joo Chiat Road, #02-01, Singapore 427469   Tel :+65 6440 4066   Fax :+65 6836 4833

 

 

 PROJECT PHOTOS   Home  Track Records  Project Photos  Company Profile  Clients  Personnel  Equipment  Certifications  Awards  Contact Us  Site Map 

  • TYPES OF STRUCTURES
  • Commercial Buildings   Residential Buildings 
  • Public Buildings :  Hospitals   Universities   Community Centres 
  • Infrastructures :  MRTs   Flyovers/Expressways   Bridges   Airport  
  • Marine Structures   SemiConductor Buildings   Petrol-Chemical Plants
  • TYPES OF PILES
  • Rock Socketing   Within MRT's Reserves   Non Vibration                           
  • Secant Pile Wall   Raker Bored Pile   Base Grouted Bored Pile
  • Pile Testing
  •  

                                      

    BRIDGES

     

    Upgrading of Mountbatten Bridge

         

                              Installing ultimate test pile                                                     Preparing temporary steel platform for boring rig                   Boring rig on steel platform, coring river slab

     

        

              Double wall casing with concrete slab core                   Existing abondoned concrete buttress cored by boring rig                             QC check on bentonite  

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Reconstruction of Vehicular Bridge at AYE across Sungei Pandan

         

              Boring pier bored pile with permanent casing                                   Completed bored piles, ready for bridge beam casting                  Catcher to prevent slurry polution

     

       

                   Osterberg - cell, working pile load test                                                                Completed bridge                                       Bored piles' permanent casings act as bridge piers

     

     

     

    CTE Widening from Bradell Interchange to PIE - Bridge Across Kallang River

        

                Bauer BG28 working on steel modular plaform                                     Boring next to existing CTE bridge                 Double casing to core existing 400mm thk canal base

     

                     

     

    Earth Control Measures :

    A - Mud tank to contain spoil & driiling slurry

    B - Specially designed catcher to prevent slurry spillage

    C - Floating protection sheet

     

    Others :

    D - Completed Pier Piles (with Permanent casing)

    E - Mini Barge to assist piling works

    F - Part of modular steel platform 

     

    Boring Rig : Bauer BG28    

     

      

     Home  Track Records  Project Photos  Company Profile  Clients  Personnel  Equipment  Certifications  Awards  Contact Us  Site Map